![]() |
Joint setup and operation |
![]() |
||
2005 was the second year that SNNT and Orange County "N" gineers have operated a joint setup |
||||
The joint operation facilitates the operation of longer trains and more trains. The blue and yellow lines were DC operations |
||||
The red line was DCC operated by SNNT providing support for up to 5 trains running at any given time on it. |
||||